
Overnominations
Utilise possible overnominations – with pinpoint precision and in real time.
So you want to know, in real time, the relevant cross-border and market area interconnection points and storage facility connection points at which overnominations can be made. You can find this information in our continually updated report.
The report enquires in real time about the points where overnominations are permitted for the current and the following gas day. Are you interested in a particular point? Then simply limit the results to this by using the filter bar above the report.
go to report