Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Press releases / jpg / 583.09 KB

OGE compressor station Emsbüren / Image 2

For the first time in Germany, the conversion of a long-distance gas pipeline to transport hydrogen was started at OGE's Emsbü-ren compressor station.

Press releases / pdf / 47.25 KB

"Pipe clear for H2": OGE and Nowega start first conversion of a pipeline from natural gas to hydrogen

Under the motto "Pipe free for H2", the long-distance gas network operators Nowega and OGE today celebrated an important step on the way to the hydrogen age in Lower Saxony. For the first time in Germany, the conversion of a long-distance gas pipeline to transport hydrogen was started at OGE's Emsbüren compres-sor station.

Press releases / jpg / 576.17 KB

OGE compressor station Emsbüren / Image 1

For the first time in Germany, the conversion of a long-distance gas pipeline to transport hydrogen was started at OGE's Emsbüren compressor station.

Press releases / pdf / 70.55 KB

Success in energy supply: OGE completes connection pipeline to second floating LNG terminal in Wilhelmshaven

OGE completes connection pipeline to the perspective second floating LNG terminal in Wilhelmshaven.

Market information / xls / 64.00 KB

Relevant Points of the Transmission System Operators

in accordance with Article 18(4) VO 715/2009 (as on: 01 October 2023)

Price sheet, Network access / pdf / 696.58 KB

Price Sheet of Open Grid Europe GmbH for entry and exit contracts as well as internal orders in accordance with Cooperation Agreement XIII.1 in the market area Trading Hub Europe GmbH

Valid for gas shipments from 1 January 2024

Press releases / pdf / 647.09 KB

Research project on hydrogen storage launched

Bierwang porous rock storage is being tested for its feasibility as a hydrogen storage facility. Commissioning begins with first hydrogen storage. Hydrogen storage essential for the decarbonization of the European energy market.

Press releases / jpg / 877.48 KB

Ground-breaking ceremony for OGE's H2 training centre in Werne on 7 August 2023

Ground-breaking ceremony for OGE's H2 training line in Werne on 07/08/2023, from left: Lothar Christ, Mayor of Werne, Dr. Jörg Bergmann, Chairman of the Management Board, OGE, Raphael Heuser, Project Manager H2 training line, OGE, Carolin Kleinert, Engineering Manager, H2 training line, OGE, Dr. Thomas Hüwener, Member of the Management Board, OGE, Hendrik Wüst, Minister President of the State of North Rhine-Westphalia.

Press releases / pdf / 115.65 KB

North Rhine-Westphalia's Premier Wüst at the ground-breaking ceremony for the OGE training track in Werne, the only one of its kind in Europe

Hydrogen: Hendrik Wüst, Premier of North Rhine-Westphalia, attends the ground-breaking ceremony for the new OGE H2 training centre in Werne, the only one of its kind in Europe. From craftspeople to engineers: OGE to train hydrogen professionals for the future. Hendrik Wüst, Premier of North Rhine-Westphalia, views hydrogen as a key enabler for the energy transition and for the transformation to climate neutrality. Entry into the hydrogen economy with a nationwide core network and H2 training centre.

Suppliers / pdf / 103.84 KB

Standard Terms and Conditions of Purchase

Last revised June 2023

Call for tenders / pdf / 214.63 KB

Delivery Terms / form of contract

EFET European Federation of Energy Traders

Call for tenders / pdf / 258.17 KB

OGE Fuel Gas Tender 2024

Overview of the tender, Offer Sheets Bands & Structures, The nomination process, Documents for prequalification

Press releases / pdf / 280.90 KB

Construction approval: Planning decision for the WAL II LNG pipeline link has been made

Lower Saxony’s State Office for Mining, Energy and Geology (LBEG) completes permitting procedure for WAL II and approves construction. WAL II will connect the second LNG terminal in Wilhelmshaven with the gas transmission pipeline system by the end of 2023. New pipeline will bolster energy security and increase independence from Russia.

Market information / pdf / 0.96 MB

Ruling of the Federal Network Agency BK9-22/042

Approval of the Federal Network Agency to collect fees according to Art. 26 (11) NC CAM

Price sheet, Network access / pdf / 384.96 KB

Information on tariff and multipliers of Open Grid Europe GmbH

for the yearly product of the gas year 2023/2024

Market information / pdf / 250.33 KB

Publication by Open Grid Europe GmbH according to the network code on harmonised transmission tariff structures

Art. 29 and 30 of Regulation (EU) 2017/460 (Network Code Tariffs)

Price sheet, Network access / xlsx / 254.11 KB

Fees charged by Open Grid Europe GmbH according to Section 21 (3) sentence 2 EnWG (automated readout)

Valid from 01 January 2024, 06:00 a.m., until 01 January 2025, 06:00 a.m.

Press releases / pdf / 202.07 KB

New uniform postage stamp tariff for the Trading Hub Europe (THE) market area from 1 January 2024

For the Trading Hub Europe (THE) market area the transmission system operators have determined the uniform tariff from 1 January 2024 on the basis of the Federal Network Agency’s (BNetzA) REGENT 2021 decision.

Market information / pdf / 205.80 KB

IP-specific additional capacities

Gas Year 2023/2024

Company / pdf / 10.35 MB

Sustainability Report 2022

Published 27 April 2023