Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Press releases / pdf / 31.06 KB

Carbon Management: Signing of a Memorandum of Understanding between Equinor and OGE

In the presence of the Federal Minister, Dr. Robert Habeck MdB, and the Norwegian Energy Minister, Terje Aasland, Dr. Jörg Bergmann, CEO of OGE, and Irene Rummelhoff, Executive Vice President at Equinor ASA, signed a letter of intent as part of the North Sea Dialogue.

Company / pdf / 12.09 MB

Sustainability Report 2023

Published 26 March 2024

Press releases / pdf / 78.57 KB

"Safe, meaningful and progressive": OGE publishes its sustainability report for the 2023 financial year

Our sustainability report for 2023 shows our activities regarding ecology, economy and social issues.

Others / pdf / 1.01 MB

Annual Report 2023

Open Grid Europe GmbH

Press releases / pdf / 64.91 KB

OGE puts its TransHyDE H2 laboratory – which is unique in Germany – into operation

Within the span of two years, OGE has planned, built and commissioned its innovative TransHyDE H2 laboratory in Essen. The TransHyDE project is one of three flagship hydrogen projects funded by the German Ministry of Education and Research.

Press releases / pdf / 4.60 MB

Rh2ein-Main Connect

Hydrogen regional network map Rhine-Main 2024 (only in German)

Press releases / pdf / 48.03 KB

Energy supplier alliance gives go-ahead for regional hydrogen distribution network in Frankfurt/Rhine-Main

Metropolitan region to receive hydrogen regional network Rh2ein-Main Connect.

Press releases / jpg / 2.26 MB

Contract signing partners for the Rh2ein-Main Connect regional hydrogen network in Wiesbaden

Sabine Augustin, Head of Corporate Development, Policy & Communications OGE (front row, second from left) together with the other project managers after signing the contract for the Rh2ein-Main Connect regional hydrogen network in Wiesbaden

Suppliers / pdf / 2.59 MB

Safety Requirements for Contractors

lays down safety rules to be observed by all contractors

Press releases / pdf / 332.55 KB

The H2med project is entering a new phase of its development.

The three developing partners of the BarMar project, Enagás and GRTgaz and Teréga , in coordination with OGE, have decided to award the Wood company to conduct the preliminary engineering studies, perform the analysis of route alternatives and select the corridor of the BarMar project.

Press releases / pdf / 132.39 KB

Dr. Thomas Hüwener becomes Spokesman of the Management Board of OGE

OGE has made early arrangements for the succession of current CEO Dr. Jörg Bergmann: Dr. Thomas Hüwener will be-come spokesman of the management board on 01 July 2024.

Press releases / jpg / 2.32 MB

Press photo: Dr. Thomas Hüwener becomes Spokesman of the Management Board of OGE

OGE has made early arrangements for the succession of current CEO Dr. Jörg Bergmann: Dr. Thomas Hüwener will become spokesman of the management board on 01 July 2024.

Market information / pdf / 157.67 KB

List of test procedures in the flexible accreditation area

Valid from 16 January 2024 (only in German)

Market information / pdf / 38.90 KB

General rulings by the federal load distributor - self-declarations by RLM customers

General customer information on the general ruling, as at 08 December 2023

Market information / pdf / 455.77 KB

Ruling of the Federal Network Agency BK9-22/612

Decision ‘MARGIT 2024‘ of 26/05/2023

Others / pdf / 93.91 KB

General Terms and Conditions for the Delivery of Goods and/or Services

by Open Grid Europe GmbH, Status January 2023

Internal order / xlsx / 60.93 KB

Internal order capacity data for 2024

contains information from joint pipelines (only in German)

Press releases / jpg / 850.75 KB

OGE and Nowega start first conversion of a pipeline from natural gas to hydrogen

From left to right: Frank Heunemann (Managing Director Nowega); Markus Silies, Mayor of Emsbüren; State Secretary Anka Dobslaw, Lower Saxony Ministry for the Environment, Energy and Climate Protection; State Secretary Silke Krebs, Ministry for Economic Affairs, Industry, Climate Protection and Energy of the State of North Rhine-Westphalia, Dr Thomas Hüwener, Member of the Management Board OGE.

Press releases / jpg / 583.09 KB

OGE compressor station Emsbüren / Image 2

For the first time in Germany, the conversion of a long-distance gas pipeline to transport hydrogen was started at OGE's Emsbü-ren compressor station.

Press releases / pdf / 47.25 KB

"Pipe clear for H2": OGE and Nowega start first conversion of a pipeline from natural gas to hydrogen

Under the motto "Pipe free for H2", the long-distance gas network operators Nowega and OGE today celebrated an important step on the way to the hydrogen age in Lower Saxony. For the first time in Germany, the conversion of a long-distance gas pipeline to transport hydrogen was started at OGE's Emsbüren compres-sor station.