Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Field sites / pdf / 95.11 KB

Directions to Vinnhorst PRMS station

Schulenburger Landstraße 338, 30419 Hannover

Field sites / pdf / 99.19 KB

Directions to Hobbensen PRMS

Stemmer Straße, 31655 Stadthagen

Field sites / pdf / 209.03 KB

Directions to Legden PRMS station

Asbecker Str. (K29), 48739 Legden

Field sites / pdf / 74.68 KB

Directions to Field Station Aegidienberg

Auf dem Romert 30, 53604 Bad Honnef

pdf / 98.11 KB

Directions to Renzenhof Field Station

Röthenbachtal 1, 90552 Röthenbach an der Pegnitz

Form / pdf / 125.39 KB

Reservation request

Open Grid Europe offers its shippers a form for the efficient handling of enquiries pursuant to Section 38 GasNZV. The use of the form is intended to ensure that Open Grid Europe promptly obtains all information required to process your enquiry efficiently.

Others / pdf / 220.27 KB

Policy statement in accordance with the LkSG

Policy Statement on Human Rights Strategy, Status 28 October 2024

Field sites / pdf / 100.94 KB

Directions to Field Station Düsseldorf-Benrath

An der Kämpe 65, 40595 Düsseldorf - Benrath

Press releases / pdf / 124.38 KB

Results of the Call for Interest - H2med promoters share insights and outline future steps of the project

The results of the call for expressions of interest in the H2med corridor are promising. Almost 170 companies have participated with over 500 projects. This will help to better assess supply and demand along the hydrogen corridor from the Iberian Peninsula, through France and into the German hydrogen core grid along the entire value chain. The corridor is intended to significantly advance the decarbonisation of the economy.

Press releases / pdf / 132.36 KB

H2med projects secures CEF Funding for over 35 million euro, opening a new chapter for the Southwestern Hydrogen Corridor

On 30th of January, the European Climate, Infrastructure and Environment Executive Agency (CINEA) awarded 35,558,850 euro of grants for the H2med project studies submitted to the 2024 CEF energy call.

Market information natural gas/biogas / xls / 64.00 KB

Relevant Points of the Transmission System Operators in accordance with Article 33(4) Reg. 2024/1789

(as on: 02 February 2025)

Price sheet, hydrogen network access / pdf / 771.10 KB

Terms and conditions for entry/exit agreements for the transportation of hydrogen on the GET H2 network operated by multiple network operators

issued by the hydrogen network operators Nowega GmbH, Open Grid Europe GmbH and Thyssengas GmbH dated 10 October 2024

Form / pdf / 59.43 KB

Network operator registration

für das Vertragsmanagementsystem der Open Grid Europe GmbH
 (only in German)

Form / pdf / 28.29 KB

User registration (NO)

für das Vertragsmanagementsystem der Open Grid Europe GmbH
 (only in German)

Image / zip / 52.60 MB

press kit

Color and inverted logo, eps and jpg / Photos of the management / Photo of the headquarter / Photos of compressor station and pipeline construction. OGE grants the users the right to use, store and reproduce the texts, images and graphics provided in the press kit in whole or in part for journalistic purposes within the scope of the applicable press and copyright law, whereby OGE must be named as source/author. The use and reproduction of the OGE logo requires the prior consent of OGE.

Image / jpg / 1.84 MB

Nathalie Leroy

Member of the Board of Management at Open Grid Europe GmbH (CFO) Focus: Finance, purchasing, human resources, legal and regulatory affairs

Network connection, Metering point operation natural gas/biogas / pdf / 0.97 MB

Network connection contract

This contract governs the connection of the gas plant of the connection customer to the gas supply network of Open Grid Europe (network connection) at the connection point for the withdrawal of gas (exit point). It contains above all provisions governing the operation of, and changes to, the gas pressure regulating and metering station assigned to the network connection point, as well as the exchange of information between the parties to the contract (only in German).

Network connection, Metering point operation natural gas/biogas / pdf / 0.98 MB

Network interconnection contract

Pursuant to Article 7 of the Gas Network Access Ordinance, network operators have to sign network interconnection contracts with operators of networks to which they are connected via a network interconnection point. The specimen network interconnection contract published by Open Grid Europe is based on the provisions of Section 2 of Part 3 (Articles 26-31) and of Part 5 (Articles 52-62) of the Agreement on Cooperation between Operators of Gas Supply Networks Located in Germany as Amendement from 22nd March 2024 (KoV XIV), which is attached to the contract as Annex 5 for information. Annexes 1 to 4 of the network interconnection contract describe in more concrete terms the provisions of Section 2 of Part 3 (Articles 26-31) of the KoV XIV as provided in Article 26, Section 3 of KoV XIV. The supplementary provisions describe, in particular, the exact location of the network interconnections (Annex 1), their combination (where applicable) into exit zones (Annex 4) and the technical framework applicable to the relevant network interconnection and/or the relevant exit zone (only in German).

Market information natural gas/biogas / pdf / 110.31 KB

Contractual pressure and temperature at entry points

Valid for transports as of 01. January 2025 (German only)

Market information natural gas/biogas / pdf / 966.90 KB

BDEW/VKU/GEODE-Guideline / Crisis Preparedness Gas

BDEW/VKU/GEODE-Guideline Status 03/2024 (only in German)