Gas transmission

Market information

We stand for transparency and are happy to provide information if you are looking for details of our pipeline network and our activities on the market. 

Operational network data

Dashboard

Network map and concise information on the current conditions in our gas network.

Network data (XML) 

View network data. Ad hoc or in XML format. In each case by network point and by gas day/hour.

Point-specific network data 

View network data for a specific point and download it in Excel or CSV. 

Intraday network report 

Follow the current gas day hour by hour – throughout the day from 6 a.m. to 6 a.m.

Action plan 

Maintenance work, newbuild projects, changes and expansion projects.

Nomination 

Find out in real time which points are eligible for oversubscription.

MaLo-ID / Metering point designation 

Preventing incorrect allocations: values for clearly assigned measuring points.

The list of bookable points can be found here.

Market information / pdf / 74.19 KB

Minimum contractual pressures at entry points

Minimum contractual pressures at entry points (only in German)

Internal order / pdf / 8.89 KB

Gas quality documents, H-gas, Exit

Gas quality documents - Appendix to capacity contract for H-gas at exit point (only in German).

Internal order / pdf / 8.89 KB

Gas quality documents, L-gas, Exit

Gas quality documents - Appendix to capacity contract for L-gas at exit point (only in German).


Legal publications 

Sitemap on network transparency 

Overview of all legal publications. For full network transparency.

Structural data

The full strength of our pipeline network in figures, pursuant to GasNEV Section 27 Paragraph 2.

Action plan 

Maintenance work, newbuild projects, modifications and expansion measures.

UMM / Remit

Important information about the gas market: the latest Urgent Market Messages.

Information for publication before the annual auction and the tariff period §29 §30 

About harmonised transmission

Information on Article 4.1 of Regulation (EU) 2015/703 (Network Code Inter 

Rules for interoperability and data exchange (NC INT) with network users.

Consultation H-gas VIP

Agreement on Implemen­tation of a Virtual Inter­connection Point between the Entry-Exit-Systems for H-gas of Gasunie Transport Services and NetConnect Germany.

Consultation L-gas VIP

Agreement on Implemen­tation of a Virtual Inter­connection Point between the Entry-Exit-Systems for L-gas of Gasunie Transport Services and NetConnect Germany.

Document download

Consultation / pdf / 137.39 KB

Virtual Interconnection Point between the Entry-Exit-Systems for H-gas

of Gasunie Transport Services and NetConnect Germany

Consultation / pdf / 138.81 KB

Virtual Interconnection Point between the Entry-Exit-Systems for L-gas

of Gasunie Transport Services and NetConnect Germany


General information 

Management information 

Applying for a free-of-charge information on buried lines in good time before a construction project.

L-/H-Gas conversion

The gradual switch to H-gas, together with all transmission system operators.

VIP

Updates on the establishment of virtual interconnection points.

Gas crisis prevention 

Measures from the "Gas Crisis Prevention" guide – for maximum security of supply. 

Document download

Market information / pdf / 338.07 KB

Publication of network areas with a higher probability of a market area change

As of October 31 of each year, transmission system network operators are obligated to publish the network areas for which a higher probability of a market area change or adjustment exists (Sec. 5 (7) of the Cooperation Agreement). This could apply to the following network area: Oberhessengas Netz GmbH, Stadtwerke Lengerich GmbH. The publication includes network areas for which there is an increased probability of a market area change or adjustment by 2022. Due to the amendment of the Gas Network Access Ordinance (GasNZV), the two German market areas will be merged by April 2022 at the latest. In the event of new material findings, there will be an update for independently of the deadline mentioned.