Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Press releases / jpg / 1.34 MB

Press photo: First German LNG Terminal to Open in Wilhelmshaven. German Chancellor Olaf Scholz Visits the Completed Facilities.

From left: Olaf Lies (Minister of Economics of Lower Saxony), Franz-Josef Kissing (Project Manager OGE), Thomas Hüwener (Member of the Management Board OGE), Morten Höegh (Shipping company Höegh), Christian Lindner (Federal Minister of Finance), Siemtje Möller (Parliamentary State Secretary in the Federal Ministry of Defence), Niels Fenzl (Project Manager Uniper), Olaf Scholz (Federal Chancellor), Stephan Weil (Minister President of Lower Saxony), Holger Banik (Managing Director Niedersachsen Ports), Robert Habeck (Federal Minister of Economics), Christian Meyer (Minister of the Environment of Lower Saxony), Carsten Feist (Mayor of Wilhelmshaven)

Market information natural gas/biogas / pdf / 310.53 KB

Annual Monitoring Report pursuant to KAP+

According to tenor 3 lit. b) KAP+ (BK7-19-037)

Press releases / pdf / 463.33 KB

First German LNG Terminal to Open in Wilhelmshaven. German Chancellor Olaf Scholz Visits the Completed Facilities.

Implementation in record time at ‘Germany's New Fast Pace’. German Chancellor Olaf Scholz, Niedersachsen's Prime Minister Stephan Weil, German Minister for Economic Affairs Robert Habeck, and the Federal Minister of Finance Christian Lindner attend the opening ceremony of the facilities on the North Sea shore. The project was implemented by the three companies Niedersachsen Ports, OGE, and Uniper.

Press releases / jpg / 2.26 MB

Press photo: Final weld marks completion of WAL pipeline link: System now ready to take LNG – and in future also hydrogen

From left: Thomas Hüwener (Member of the Management Board of OGE), Franz-Josef Kissing (Project Manager WAL, OGE), Olaf Lies (Minister for Economic Affairs, Construction, Transport and Digitalisation of the State of Lower Saxony), Anka Dobslaw (State Secretary in the Lower Saxony Ministry for the Environment, Energy and Climate Protection), Christoph Köhler (Commercial Project Manager WAL, OGE), Malte Tammeus (Head of Department, Wittmund District) and Helfried Goetz (Mayor of Friedeburg)

Press releases / pdf / 219.29 KB

Final weld marks completion of WAL pipeline link: System now ready to take LNG – and in future also hydrogen

WAL link completed reliably and safely in record time. WAL will help feed regasified LNG from Wilhelmshaven into the German gas grid and contribute to Germany's energy supply. H2-ready pipeline is a crucial cornerstone for Germany’s future hydrogen economy.

Price sheet, Network access natural gas/biogas / pdf / 647.60 KB

Price Sheet of Open Grid Europe GmbH for entry and exit contracts as well as internal orders in accordance with Cooperation Agreement XIII.1 in the market area Trading Hub Europe GmbH

Valid for gas shipments from 1 January 2023

Market information natural gas/biogas / pdf / 757.54 KB

Ruling of the Federal Network Agency BK9-21/612

Decision ‘MARGIT 2023‘ of 02/06/2022

Press releases / pdf / 203.73 KB

New uniform postage stamp tariff for the Trading Hub Europe (THE) market area from 1 January 2023

The gas transmission system operators (TSOs) have recalculated their network charges for the Trading Hub Europe (THE) market area applicable from 1 January 2023 on the basis of the Federal Network Agency's (BNetzA) decision entitled "Approval of the recalculation of the reference price for 2023 (REGENT recalculation 2023, BK9-22/615)".

Market information natural gas/biogas / pdf / 782.15 KB

BDEW/VKU/GEODE-Guideline / Crisis Preparedness Gas

BDEW/VKU/GEODE-Guideline (only in German)

Market information natural gas/biogas / pdf / 121.34 KB

Contractual minimum pressures and minimum temperatures at entry points

Valid for transports as of 01. October 2021 (German only)

Internal order / xlsx / 65.99 KB

Internal order capacity data for 2023

contains information from joint pipelines (only in German)

Press releases / pdf / 219.85 KB

Preparations underway for the construction of the TENP III natural gas pipeline

Working strip to be provided along pipeline route in the Palatinate Forest with logging of trees to start in November 2022. Replacement of telecommunications cables. TENP I pipe string in Rhineland-Palatinate to be replaced in 2023.

Press releases / pdf / 226.79 KB

Regional planning procedure for the Heek-Epe (HEp) hydrogen pipeline successfully completed

Münster district government considers the project to comply with regional planning guidance. A 600-metre-wide route corridor has been identified. The final route of the pipeline will be determined as part of the subsequent planning approval process.

Others / pdf / 2.96 MB

Energy management system

Energy management system certification according to ISO 50001 (only in German)

Others / pdf / 3.15 MB

Quality management system

Quality management system certification according to ISO 9001 (only in German)

Press releases / jpg / 815.64 KB

OGE's Energy Policy Dialogue in Berlin on 28 September 2022

The panel participants from left to right: Dr Patrick Wittenberg, Ina Böttcher, Dr Jörg Bergmann, Dr Marie Jaroni, Andreas Rimkus, René Rock

Press releases / pdf / 79.90 KB

Hydrogen in times of fundamental change – OGE's Energy Policy Dialogue hosted in Berlin for the first time puts focus on the hydrogen ramp-up and infrastructure

For the hydrogen ramp-up to succeed now, industry and politics need to work hand-in-glove. What this cooperation should look like and how politicians at federal and state level and industry can support each other was the subject of the 8th Energy Policy Dialogue 2022 hosted by OGE in Berlin for the first time.

Price sheet, Network access natural gas/biogas / xlsx / 254.04 KB

Fees charged by Open Grid Europe GmbH according to Section 21 (3) sentence 2 EnWG (automated readout)

Vaild from 01 January 2023, 06:00 a.m., until 01 January 2024, 06:00 a.m.

Press releases / pdf / 518.40 KB

2022-09-19 Carbon-neutral fuel from residues and waste – Vier Gas Transport establishes operator company bioplus LNG

Carbon-neutral fuel from residues and waste – Vier Gas Transport establishes operator company bioplus LNG.

Press releases / jpg / 5.93 MB

Signing of the liquefaction contract

Signing of the liquefaction contract between bioplus LNG represented by its Board members Christine Wilinski and Michael Kranich and GasCom represented by Norbert Scholz Managing Partner and Matthias Hoffmann Deputy Technical Managing Director.