Network connection, Metering point operation natural gas/biogas / pdf / 756.02 KB
Gas metering point operator framework agreement
According to the Federal Network Agency's ruling of 23 August 2017 (Ref.: BK7-17-026), metering point operators within the meaning of Section 2 (12) of the Metering Point Operation Act (MsbG) and …operators of gas supply networks within the meaning of Section 3 (6) of the Energy Industry Act (EnWG) are obliged to conclude new metering point operator framework agreements pursuant to Section 9 (1) para. 3 of the MsbG. The resolution governs the adaptation of the standard agreements to the requirements of the Act on the Digitisation of the Energy Transition. The gas metering point operator framework agreement (MSB-RV Gas) available for download here corresponds as required to the amendment of the gas metering point operator framework agreement as specified in ruling BK7-09-001 on the MSB-RV Gas on 9 September 2017 (only in German).