Media library
In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.
Price sheet, Network access natural gas/biogas / pdf / 470.96 KB
NCG Price sheet of Open Grid Europe GmbH 2020
for entry and exit contracts and internal orders pursuant to Cooperation Agreement X.2 in the market area of NetConnect Germany GmbH & Co. KG, valid for shipments from 01.01.2020
Image / zip / 2.81 MB
OGE logo
Color and inverted logo, eps and jpg OGE grants the users the right to use, store and reproduce the texts, images and graphics provided in the press kit in whole or in part for journalistic purposes …within the scope of the applicable press and copyright law, whereby OGE must be named as source/author. The use and reproduction of the OGE logo requires the prior consent of OGE.
Market information natural gas/biogas / pdf / 56.83 KB
Supplementary Terms and Conditions of Open Grid Europe GmbH
Supplementary Terms and Conditions of Open Grid Europe GmbH - Section 8 on separate process for bundled nominations (Section 12 (13) of Entry / Exit Contract) - Overview of bundled nomination …pursuant to Regulation (EU) No. 984/2013 at cross-border interconnection points.
Market information natural gas/biogas / pdf / 502.15 KB
CBP (2014-001/01): Harmonisation of the Nomination and Matching Process for Double-Sided and Single-Sided Nomination
CBP (2014-001/01): Harmonisation of the Nomination and Matching Process for Double-Sided and Single-Sided Nomination: The following Common Business Practice (CBP) has been approved by EASEE-gas for …use in gas business transactions across connection points and constitutes recommendations for the part of the process which relates specifically to (re-)nominations and involves shippers on one hand, and system operators on the other hand. This CBP reflects minimum requirements in line with the network codes in the areas referred to in Article 8(6) of the Regulation (EC) 715/20091. This CBP does not exclude additional provisions between individual parties
Market information natural gas/biogas / pdf / 56.83 KB
Special features of bundled nominations
Supplementary Terms and Conditions of Open Grid Europe GmbH - Section 8 on separate process for bundled nominations (Section 12 (13) of Entry / Exit Contract) - Overview of bundled nomination …pursuant to Regulation (EU) No. 984/2013 at cross-border interconnection points.