Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Others / pdf / 4.66 MB

Gas for Climate – 2020 Gas Decarbonisation Pathways

Appendix "Gas decarbonisation pathways 2020–2050"

Price sheet, Network access natural gas/biogas / pdf / 470.96 KB

NCG Price sheet of Open Grid Europe GmbH 2020

for entry and exit contracts and internal orders pursuant to Cooperation Agreement X.2 in the market area of NetConnect Germany GmbH & Co. KG, valid for shipments from 01.01.2020

Price sheet, Network access natural gas/biogas / pdf / 330.83 KB

GASPOOL Price sheet of Open Grid Europe GmbH 2020

for entry and exit contracts pursuant to Cooperation Agreement X.2 in the market area of GASPOOL Balancing Services GmbH valid for shipments from 01.01.2020.

Others / pdf / 5.08 MB

Annual Report 2019

Open Grid Europe GmbH

Field sites / pdf / 1.49 MB

Directions to Field Station Landshut

Ergoldinger Str. 2b, 84030 Landshut

Image / zip / 2.81 MB

OGE logo

Color and inverted logo, eps and jpg OGE grants the users the right to use, store and reproduce the texts, images and graphics provided in the press kit in whole or in part for journalistic purposes within the scope of the applicable press and copyright law, whereby OGE must be named as source/author. The use and reproduction of the OGE logo requires the prior consent of OGE.

Brochure / pdf / 660.43 KB

TENP de-odorisation

Non-technical summary (only in German)

Market information natural gas/biogas / pdf / 117.25 KB

VIP TTF-NCG-H and VIP TTF-NCG-L

Market information (status of 10 February 2020)

Internal order / pdf / 19.41 KB

Gas quality documents, H-gas, Exit

Gas quality documents - Appendix to capacity contract for H-gas at exit point (only in German).

Form / xlsx / 19.14 KB

Declaration of biogas costs

Declaration of biogas costs (only in German).

Internal order / pdf / 19.42 KB

Gas quality documents, L-gas, Exit

Gas quality documents - Appendix to capacity contract for L-gas at exit point (only in German).

Market information natural gas/biogas / pdf / 56.83 KB

Supplementary Terms and Conditions of Open Grid Europe GmbH

Supplementary Terms and Conditions of Open Grid Europe GmbH - Section 8 on separate process for bundled nominations (Section 12 (13) of Entry / Exit Contract) - Overview of bundled nomination pursuant to Regulation (EU) No. 984/2013 at cross-border interconnection points.

Market information natural gas/biogas / pdf / 502.15 KB

CBP (2014-001/01): Harmonisation of the Nomination and Matching Process for Double-Sided and Single-Sided Nomination

CBP (2014-001/01): Harmonisation of the Nomination and Matching Process for Double-Sided and Single-Sided Nomination: The following Common Business Practice (CBP) has been approved by EASEE-gas for use in gas business transactions across connection points and constitutes recommendations for the part of the process which relates specifically to (re-)nominations and involves shippers on one hand, and system operators on the other hand. This CBP reflects minimum requirements in line with the network codes in the areas referred to in Article 8(6) of the Regulation (EC) 715/20091. This CBP does not exclude additional provisions between individual parties

Market information natural gas/biogas / pdf / 56.83 KB

Special features of bundled nominations

Supplementary Terms and Conditions of Open Grid Europe GmbH - Section 8 on separate process for bundled nominations (Section 12 (13) of Entry / Exit Contract) - Overview of bundled nomination pursuant to Regulation (EU) No. 984/2013 at cross-border interconnection points.

Market information natural gas/biogas / pdf / 226.84 KB

Methodology for the calculation of technically available capacity

in the transmission network operated by Open Grid Europe.

Suppliers / pdf / 91.70 KB

Standard Terms and Conditions for the Provision of Construction Services

Suppliers / pdf / 148.92 KB

Standard Terms and Conditions for the Procurement

of Plant, Machinery, and Electrical Equipment of Open Grid Europe GmbH

Instructions / pdf / 1.21 MB

Quick guide for suppliers on how to use Futura SRM to submit an offer

Angebot zu einer Anfrage erstellen und abgeben (only in German)

Instructions / pdf / 761.45 KB

Quick guide for suppliers on how to use Futura SRM to record services rendered

Erbrachte Leistungen zu einer Bestellung abrechnen und an den Auftraggeber übermitteln (only in German)

Instructions / pdf / 3.63 MB

Manual on how to use the Futura SRM internet portal

Dokumentation und ausführliche Informationen (only in German)